Manage supplier responses, full-lot containment, occurrence and detection causes, dependent corrective/preventive actions and revision-specific effectiveness review.

Resolve links a supplier issue to a named response commitment, whole-lot containment and evidence for both the occurrence cause and the detection escape. Corrective and preventive actions have acceptance criteria and prerequisites. Material scope, cause or action changes invalidate readiness while retaining prior evidence. Effectiveness checks use a planned follow-up lot, minimum sample and method. Failed or follow-up conclusions require next-work notes, reset action completion and increment the plan revision. This is manual supplier-quality coordination, not certification or statistical sampling.
Built for Supplier quality engineers and operations teams managing incoming quality issues.
Manage supplier responses, full-lot containment, occurrence and detection causes, dependent corrective/preventive actions and revision-specific effectiveness review.
See open cases and the selected supplier, lot, quantity and containment status.
Record an active supplier, part or lot, affected quantity, severity, owner and due date.
Document containment, root-cause findings and lifecycle transitions.
Assign actions, record completion and conduct a sample-based effectiveness review.
Create suppliers, edit contacts/categories and guard inactivation against open cases.
Record the supplier contact, response deadline and acknowledgement. The dashboard prioritizes response due dates and shows high/critical exposure.
Progress to Contained only after the full affected quantity is accounted for, with an owner and evidence. Correcting requires occurrence cause, detection escape and supporting evidence.
Plan at least one corrective and one preventive action. Preceding-action dependencies block premature completion; material edits reset readiness and preserve history.
Set a follow-up lot, method, minimum sample and due date. Effective requires the planned lot, sufficient sample, zero failures and completed work; failed reviews require follow-up notes.
The pilot uses 2 tables with fictional records. No external database is needed to explore the source app.
| Table | Sample data | What it stores |
|---|---|---|
| Suppliers | 3 sample suppliers | Machined components, packaging and electronics supplier contacts. |
| Quality cases | 9 sample cases | Nine fictional cases including seal-groove depth, barcode scans, crimp pull force, coating edges, tray fit and connector latch strength; six detailed benchmark cases plus three legacy examples. |
Manual records only: no supplier emails, procurement integrations, access-role enforcement, certification or statistical acceptance-sampling guarantee. Response deadlines are recorded commitments, without automatic escalation. Desktop English with a 1,000-record limit per dataset. Export package and clean-install validation remain pending.
This design is a starting point. Describe the look you want, add your logo and brand colors, or ask for new features in a prompt. Use the starter prompt to build your own version in the ToolJet AI builder, or use a suggested prompt to modify an app you already have. Review and test the result.
Suggested prompts describe changes you can request. Additional features and translations still need to be built and tested.
Choose ToolJet Cloud, or download the application package to import into your self-hosted instance once the template is released.
Explore the sample records in ToolJet Database, then add your records and configure the workflow for your team.
Describe your preferred design, branding, and new features in the AI builder. Test your workflow, then share your app with the people who need it.
Supplier commitments, lot containment, occurrence and escape causes, dependent corrective/preventive actions, planned verification and revision-specific effectiveness evidence.
A supplier response, complete containment of the affected quantity, occurrence and detection causes with evidence, and both corrective and preventive actions with acceptance criteria.
An action with a prerequisite cannot be marked Done until that preceding action is Done. Completion requires evidence.
Material scope, cause or action changes reset the affected readiness and increment the plan revision. Previous notes and conclusions remain historical.
Completed work and an Effective review against the planned lot with at least the minimum sample and zero observed failures.
Follow-up notes are required. The case returns to Correcting, completed actions reset and the plan revision increases.
No. It records manual response commitments and quality evidence without sending messages or making certification claims.
Yes. Prompt for branding, fields and workflow changes, then test the resulting implementation.